Powering-up the Switch 4200
use the following sequence of steps to power-up the switch.

    1 plug the power cord into the power socket at the rear of the switch.

    2 plug the other end of the power cord into your power outlet.

    the switch powers-up and runs through its power on self test (post), which takes approximately 10 seconds.

   

   
3Com SuperStack 3 Switch 4250T(3C17302) 相关内容:报价 | 参数 | 图片 | 论坛 | 评测