PRE-INSTALLATION
1. carefully unpack case from shipping carton. do not unpack fabric and roller assembly yet.

    2. make sure to recheck measurement of case for proper installation clearance.

    3. remove any protective foam or tape from case.

    case installation
DA-LITE 便携幕 相关内容:报价 | 参数 | 图片 | 论坛 | 评测