Power-on Utilities
there are three power-on utilities to set up and test ttp-243/342 hardware.

    these utilities are activated by pressing the feed or pause button and turning on the printer power simultaneously. the utilities are listed as below:

    1. self-test

    2. gap sensor calibration

    3. printer initialization

   

   
TSC TTP-342M 相关内容:报价 | 参数 | 图片 | 论坛 | 评测