INSTALLATION FOR RS232, OCIA AND IBM 46XX INTERFACES
1. turn off the host system.

    2. plug the male 10-pin rj45 end of the powerlink cable into the 10-pin jack on the ms7120.

    3. connect the 9 pin female end of the powerlink cable to the host device.

    skip to #6 if receiving power from the host system.

    4. plug the power supply's l-shaped plug into the power jack on the powerlink cable.

    5. check the ac input requirements of the power supply to make sure the voltage matches the ac outlet. the outlet should be installed near the equipment and be easily accessible. connect ac power to the transformer.

    6. turn on the host system.

   

    1、when the scanner first receives power, the green led will turn on. then the scanner will beep once and the red led will flash simultaneously.

    2、plugging the scanner into the serial port of the pc does not guarantee that scanned information will appear at the pc. a software driver and correct configuration setting are also required for proper communication to occur.

    1、to maintain compliance with applicable standards, all circuits connected to the scanner must meet the requirements for selv (safety extra low voltage) according to en 60950.

    2、to maintain compliance with standard csa c22.2 no. 950/ul 1950 and norm en 60950, the power source should meet applicable performance requirements for a limited power source.

   

   
Metrologic MS-7120立式激光平台 相关内容:报价 | 参数 | 图片 | 论坛 | 评测