Power-On Self-Test
after power is turned on and before the operating system is installed, the partition does a power-on self-test (post). this test performs checks to ensure that the hardware is functioning correctly before the operating system is installed. during the post, a post screen displays, and post indicators display on the virtual terminal. the next section describes the post indicators and functions that can be accessed during the post.