Local Configuration Setup Procedure
general

    before starting any configuration action:

    1 review relevant configuration parameters given in section 3.4.

    2 consult the list of the required parameters from the network subscription data, and/or from your system administrator.

    → to set up the fcd-2 configuration, act in the following order:

    1. select the system parameters.

    2. select the main link parameters.

    3. select the channel parameters.

    4. select the supervisory port parameters (if fcd-2 is going to be controlled via a terminal)

    the general configuration procedure is explained below. tables in section 3.4 list special considerations and guidelines for each group of parameters.

    general configuration procedure

    before starting the configuration procedure, make sure that all the user-initiated loopbacks are disconnected. if you try to configure while a user-initiated loopback is active, you will receive the message config error 01.

    → to disconnect the loopbacks:

    ·select none under test options (see section 5.4 in chapter 5).

    if your configuration attempt is invalid, fcd-2 shortly displays a config error xy message (the code xy identifying the error) and then returns to its normal display. for explanation of the configuration error messages, refer to section 5.5 in chapter 5.

    → to configure the unit, follow the steps below:

   

   

   
RAD FCD-2 相关内容:报价 | 参数 | 图片 | 论坛 | 评测