Operating Loopbacks and BERT from the Front Panel
before starting the execution of a test, pay attention to the following points:

    1 you can connect only one ioopback at a time.

    2 if a loopback is already connected, the test indicator lights. if you try to connect a ioopback while another ioopback of the same type is already in progress, fcd-2 displays the error 03 message (ioopback already in progress).

    3 the loop ra ml, loop ld ml, loop rd ml and loop l ch ioopbacks can be connected only when the internal dbg jumper is set to on.

   

    deactivating tests

    to deactivate a test:

    1. display test option none using the procedure given above.

    2. bring cursor to the none field.

    3. press enter.

    the test is deactivated and the test indicator turns off.

   

   
RAD FCD-2 相关内容:报价 | 参数 | 图片 | 论坛 | 评测