Power-Up Self-Test
fcd-2 performs the power-up self-test upon turn-on. the self-test sequence tests the critical circuit functions.

    in case of failure, fcd-2 displays self-test failed in the second row of the front-panel lcd; one or more alarm indicators light on the fcd-2 panel, as described in section 3.5, and traffic may be partially or totally disrupted.

   
RAD FCD-2 相关内容:报价 | 参数 | 图片 | 论坛 | 评测