Starting the System with an HMC Attached
after the required cables are installed and the power cables are connected, the hmc user interface provides a power-on function to turn on the power to the system. the power-on button on the operator panel can be pushed to initialize the system. progress indicators, also referred to as checkpoints, are visible on the operator panel display as the system power is turned on. the power-on led on the system stops blinking and stays on, indicating the system power is on.

   
IBM pSeries 615 相关内容:报价 | 参数 | 图片 | 论坛 | 评测