Placing the Model 6C3 into the Service Position
when placing the model 6c3 into the service position, it is essential that all stability plates are firmly in position to prevent the rack from toppling. ensure that only one system drawer at a time is in the service position.

    before doing any service actions inside the model 6c3, you must place the system into the service position. to place the system into the service position, do the following:

    1. open the front rack door.

    2. if your system is equipped with two thumbscrews securing it to the rack, remove the thumbscrews. the screws are located on the bezel, just above each system release latch.

   

    3. release the system release latches on both the left and right sides.

    4. pull the system drawer out from the rack until the rails are fully extended.

    when the system rails are fully extended, safety latches on the slide rails lock into place. this action prevents the system from being accidentally pulled out too far and dropped. the following illustration shows a system drawer in the service position.

   

   
IBM pSeries 615 相关内容:报价 | 参数 | 图片 | 论坛 | 评测